Laserfiche WebLink
III <br /> M-2001-001 Line Camp Pit Ameindment#2 (Expansion) <br /> Exhibit F. RECLAMATION PLAN MAPS(6.4.6) <br /> Map F-1. Sequence of reclamation <br /> Map F-2. Key features of reclamation <br /> Map F-3. Elevations/topography of reclamation <br /> Figure F-1. Inline water level control structures (manual) to be used with 24-inch poly pipe <br /> between ponds to control water. <br /> 1. Level control structure (with batter-boards) <br /> 2. Inlet screen <br /> 3. Anti-seep collar (typical) <br /> III <br /> i I Installed on ridges (not dams) between ponds only if needed to <br /> better regular water levels. It is anticipated that water levels will <br /> be controlled by hydraulic connection to alluvial aquifer, as the <br /> ,. ` 4 ponds are NOT lined. <br /> ,� Locations of pipes and level control structures shown generally <br /> on Maps F-2 and F-3 installed at a depth of 5 feet below the <br /> OHWM and 7 feet below the top of the ridge between ponds. <br /> In some cases, open channels (using armored sides and floor) <br /> may replace the pipes and drainage controlled by weirs with <br /> batter-boards. <br /> Level Control Structure <br /> 1 . <br /> Lower <br /> Pond <br /> . .3 , ,„„ <br /> .� <br /> Ou Ot .- <br /> , , ,. . <br /> ' <br /> ---- ._...... _ g _ a <br /> 5182-22-001 WASTELINE, INC, Page 33 of 65 <br />