M-2001-001 Line Camp Pit Amendment#2 (Expansion) <br /> NiFF <br /> 22. Incidental products (6.3.3.(o)): no incidental products are anticipated. <br /> 23. Explosives (drilling and blasting) (6.3.3.(p)): no drilling and blasting will be done at the pit. <br /> 24. Management of storm water in accordance with CDPS requirements (: <br /> a. Objective: prevent or minimize surface discharge of runoff, including downstream <br /> sedimentation,from the site by retaining water. <br /> b. General concept: Management of storm water is integrated into the mining and reclamation <br /> plans.This section summarizes the surface water management plan. <br /> c. Divert runoff from upslope (SH-145 ROW). Buffer zone of approximately 1,000 feet on parcel <br /> outside permit area to the north is forested and generally flows into the river or infiltrates. <br /> d. Provide work areas with shallow swales and basins to allow infiltration and evaporation to <br /> ensure good trafficability and reduce tracking. <br /> e. Grade areas being mined and reclaimed to drain to ponds and basins. <br /> f. Use silt-fencing and other structural best management practices(BMP)very sparingly, at <br /> locations where there is not a desire to allow sediment to wash into ponds or swales. <br /> g. Control/prevent soil erosion on outer edge of exterior berms by grading(rough surface and <br /> swales at toe) and vegetation: minimize use of silt-fencing, rock check dams, straw bales,etc. <br /> h. Prevent surface or piped outfalls from the site,other than the permitted outfall at the southeast <br /> corner of the parcel. Inspect all exterior berms and edges of excavations and ponds within 24 <br /> hours of storm events of greater than 0.1 inches and during/after high water events on the <br /> river; document and repair as necessary. <br /> i. Place shallow swales at the toe of stockpiles, including berms,to allow water to infiltrate/ <br /> evaporate, and capture sediment off stockpiles. <br /> j. Evaluate and relocate BMP as mining progresses. Update map as required. <br /> k. Carry out BMPs for inspection and maintenance, including good housekeeping, repair and <br /> maintenance, including inspections quarterly and following precipitation events. <br /> I. Provide annual training to all miners. <br /> m. Follow spill prevention and response plan for site. <br /> n. Document all actions.Submit DMR/Inspections as per permit requirements. <br /> Figure D.1 Cross-section along highway(west edge of pit looking north) <br /> None Ditch Bockslope and maintain <br /> vertical cut for safety. <br /> H-145 <br /> „Matti Safety <br /> Harm 3' high <br /> Use materiel <br /> Frog berm <br /> to bockfiU <br /> shore aF pane <br /> �ZS <br /> 5182-22-001 WASTELINE, INC. Page 25 of 65 <br />