Laserfiche WebLink
COST SUMMARY WORK <br /> <br />Task description: Cost Summary Site: Lyons Quarry Permit Action: 2024 Cost Est Permit/Job#: M1977208 <br /> <br />PROJECT IDENTIFICATION Task #: 000 State: Colorado Abbreviation: None <br />Date: 10/22/2024 County: Boulder Filename: M208-000 <br />User: JPL Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task Hours Cost <br />001 Table 2 Demolition DEMOLISH 1 22,600.00 $11,811,459 <br />002 Table 3 Steel Demo DEMOLISH 1 615.00 $779,767 <br />003 Table 5 Other Reclamation Costs DEMOLISH 1 2,700.00 $410,681 <br />004 Excavation of On-Site Disposal Cell SCRAPER1 1 83.35 $384,267 <br />005 Installation of GCL NA 1 54.20 $174,000 <br />006 3 Ft Clay Liner Protective Cover SCRAPER1 1 23.22 $101,833 <br />007 Interstitial Fill SCRAPER1 1 14.89 $68,669 <br />008 30-inch Cover SCRAPER1 1 22.07 $101,732 <br />009 Stormwater Diversion Ditch POSTMININ <br />G <br />1 322.83 $86,204 <br />010 B-Pit Topsoil Stripping DOZER 1 25.66 $12,247 <br />011 Backfill C Pit TRUCK1 2 111.36 $380,544 <br />012 Shale from SE Corner of site to C-Pit SCRAPER1 1 32.02 $151,159 <br />013 Rough Grade Plant Area GRADER 1 6.26 $2,265 <br />014 Fine Grade Plant Area GRADER 1 13.57 $4,915 <br />015 Rough Grade C-Pit GRADER 1 5.75 $2,082 <br />016 Fine Grade C-Pit GRADER 1 17.91 $6,488 <br />017 Rip Roads and Facilities RIPPER 1 5.41 $2,629 <br />018 Grade Roads and Facilities GRADER 1 1.74 $632 <br />019 Rip Disposal Cell RIPPER 2 8.99 $8,742 <br />020 Grade Disposal Cell GRADER 1 6.14 $2,226 <br />021 Grade B-Pit Borrow GRADER 1 9.70 $3,514 <br />022 Grade Topsoil Stockpile GRADER 1 4.02 $1,456 <br />023 Topsoil Plant Area SCRAPER1 1 26.84 $117,734 <br />024 Topsoil C-Pit SCRAPER1 1 23.30 $102,209 <br />025 Topsoil Roads and Facilities SCRAPER1 1 2.24 $9,806 <br />026 Topsoil Disposal Cell SCRAPER1 1 7.43 $32,600 <br />027 Topsoil B-Pit Borrow DOZER 2 19.25 $18,353 <br />028 Plant Area Revegetation REVEGE 1 53.00 $69,065 <br />029 On-Site Disposal Cell Revegetation REVEGE 1 26.00 $34,200 <br />030 C-Pit Area Revegetation REVEGE 1 46.00 $59,960 <br />031 Roads and Facilities Revegetation REVEGE 1 7.00 $8,883 <br />032 B-Pit Borrow Area REVEGE 1 36.00 $46,636 <br />033 Topsoil Stockpile Revegetation REVEGE 1 15.00 $19,321 <br />034 Weed Control REVEGE 1 15.00 $2,914 <br />035 C-Pit Water Treatment TR-18 NA 1 1.00 $5,752,000 <br />036 Well Abandonment BOREHOLE 1 16.00 $6,207 <br />037 Mob/Demob MOBILIZE 1 5.06 $90,136