My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-27_REVISION - M2016081 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2024-11-27_REVISION - M2016081 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 9:10:12 AM
Creation date
12/2/2024 9:01:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
11/27/2024
Doc Name Note
Surety Increase
Doc Name
Request For Conversion
From
AuPt Industries LLC
To
DRMS
Type & Sequence
CN2
Email Name
HR1
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#04B Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Topsoil replacement of mining phases <br /> Site: West Side Placer Permit Action: SI-1 Rev 2 Permit/Job#: M2016081 <br /> PROJECT IDENTIFICATION <br /> Task#: 04B State: Colorado Abbreviation: None <br /> Date: 10/15/2019 County: Moffat Filename: M081-04b <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: I per day <br /> Equipment Description <br /> -Scraper: Cat 637G <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D8T-8SU <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 100 100 NA NA <br /> Ownership cost/hour: $162.02 NA $103.86 $103.86 NA NA <br /> Operating cost/hour: $184.64 NA $82.26 $82.26 NA NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA NA $0.00 $0.00 NA NA <br /> Ripper op.cost/hour: NA NA $0.00 $0.00 NA NA <br /> Operator cost/hour: $30.86 NA $41.24 $41.24 NA NA <br /> Unit Subtotals: $377.52 NA $227.36 $227.36 NA NA <br /> Number of Units: 1 0 1 1 0 0 <br /> Group Subtotals: Work: $377.52 Support: $454.72 Maint: $0.00 <br /> Total work team cost/hour: $832.24 <br /> MATERIAL QUANTITIES <br /> Initial volume: 1,389 CCY Swell factor: 1.000 <br /> Loose volume: 1,389 LCY <br /> Source of estimated volume: 10"x 75'x 600' strips <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 3,400 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Sand and gravel-Wet Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 24.00 LCY Adjusted Capacity: 24.00 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.