Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: SI-I Revised with progress <br /> Site: West Side Placer Permit Action: SI-1 Rev 2 Permit/Job#: M2016081 <br /> PROJECT IDENTIFICATION <br /> Task#: ACY State: Colorado Abbreviation: None <br /> Date: 10/15/2019 County: Moffat Filename: M081-ACY <br /> User: ACY <br /> Agency or organization name: Deep End Solutions <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description _ Used Size Hours Cost <br /> 01 a Plug water well BOREHOLE 1 4.00 $2,096 <br /> 02a Demo Rapid Thickener Pillars DEMOLISH 1 4.00 $53 <br /> 03a Regrading Pond(lx) DOZER 1 1.77 $402 <br /> 04a Overburden replacement and grading of mining SCRAPERI 1 21.17 $17,615 <br /> phases <br /> 04b Topsoil replacement of mining phases SCRAPERI 1 2.94 $2,447 <br /> 05a Grading in mining phase DOZER 1 2.91 $661 <br /> 05b Ripping compacted areas RIPPER 1 5.14 $1,266 <br /> 06a Seed mining phases REVEGE 1 9.00 $4,679 <br /> 07a Initial Mobilization MOBILIZE 1 5.78 $4,749 <br /> 07b Secondary Mobilization MOBILIZE 1 5.78 $1,037 <br /> SUBTOTALS: 62.49 $35,005 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $707 <br /> Performance bond: 1.05 Total= $368 <br /> Job superintendent: 31.25 Total= $2,168 <br /> Profit: 10.00 Total= $3,500 <br /> TOTAL 0&P= $6,743 <br /> CONTRACT AMOUNT(direct+0&P)= $41,748 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $1,774 <br /> Reclamation management and/or administration: 5.00 $2,087 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $11,105 <br /> TOTAL BOND AMOUNT(direct+indirect)= $46,110 <br /> 1 <br />