Laserfiche WebLink
Mobilization Worksheet Cont'd Task#07A Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: CRAIG <br /> Total one-way travel distance: 52.00 miles <br /> Average Travel Speed: 55.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $4,672.07 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** $76.79 <br /> **one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> E ui ment E ui ment <br /> Haul Time(Hours): 0.95 0.95 <br /> Return Time(Hours): 0.95 0.95 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 2.89 1.89 <br /> JOB TIME AND COST <br /> Total job time: 5.78 Hours <br /> Total job cost: $4,749 <br /> CIRCES Cost Estimating Software <br />