My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-27_REVISION - M2016081 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2024-11-27_REVISION - M2016081 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 9:10:12 AM
Creation date
12/2/2024 8:26:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
11/27/2024
Doc Name Note
Rute 6.5 Geotechincal Stability Exhibit
Doc Name
Request For Conversion
From
AuPt Industries LLC
To
DRMS
Type & Sequence
CN2
Email Name
HR1
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. Conclusion <br /> This exhibit provides a comprehensive framework to ensure that the West Side Placer Project meets legal requirements, <br /> achieves economic efficiency,and upholds environmental sustainability. By balancing compliance,economic optimization, <br /> environmental stewardship,safety protocols,and stakeholder engagement,the project is positioned as a responsible and <br /> sustainable mining model. <br /> Including. <br /> 1. Legal and Regulatory Compliance <br /> Adherence to Standards: This exhibit demonstrates the West Side Placer Project's commitment to meeting all legal and <br /> regulatory requirements set forth by local,state,and federal authorities. By rigorously following these standards,the <br /> project ensures lawful operations and minimizes risks of non-compliance penalties. <br /> 2. Economic Optimization <br /> Cost-Efficiency: The strategies and technologies implemented in the project are selected not only for their effectiveness <br /> but also for their cost-efficiency. This ensures that the project remains economically viable while achieving the desired <br /> outputs. The balanced approach helps in maximizing profitability while minimizing unnecessary expenditures. <br /> 3. Environmental Sustainability <br /> Eco-Friendly Practices: The exhibit outlines several advanced methods and technologies used to minimize the envi- <br /> ronmental impact of the West Side Placer Project.These include erosion control measures,restoration techniques,and <br /> continuous environmental monitoring,which help in preserving the local ecosystem and ensuring the sustainability of <br /> the project area. <br /> 4. Safety Assurance <br /> Safety Protocols and Measures: The detailed safety measures and continuous monitoring protocols discussed ensure <br /> the safety of all personnel involved in the project. By prioritizing safety,the project not only complies with occupation- <br /> al health and safety standards but also fosters a safe working environment. <br /> 5. Stakeholder Confidence <br /> Building Trust: By transparently demonstrating compliance with legal standards,economic foresight,environmental <br /> responsibility,and a commitment to safety,the exhibit helps build trust among investors,regulatory bodies,and the <br /> community. This trust is essential for the ongoing support and success of the project. <br /> Future Outlook <br /> Sustainable Development: The comprehensive measures outlined in this exhibit position the West Side Placer Project as a <br /> model for sustainable mining practices. It sets a precedent for future projects to balance economic objectives with environ- <br /> mental stewardship and social responsibility. <br /> 22 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.