Laserfiche WebLink
D(HIBIT L <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.600 (FND-SF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: Material 1.000 (CAT HB) <br /> Weight: Blade 1.438 (CAT HB) <br /> type: 1.000 (PAT) <br /> Net correction: 0.5908 <br /> Adjusted unit production: 290.61 LCY/hr <br /> Adjusted fleet production: 290.61 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.938/LCY <br /> Total job time: 20.58 Hours <br /> Total job cost: $5,608.48.11 <br /> 91 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />