My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-27_REVISION - M2016081 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2024-11-27_REVISION - M2016081 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 9:10:12 AM
Creation date
12/2/2024 8:21:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
11/27/2024
Doc Name Note
Exhibit A-S
Doc Name
Request For Conversion
From
AuPt Industries LLC
To
DRMS
Type & Sequence
CN2
Email Name
HR1
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L <br /> (C.3) Task Cost - Ore and Overburden Replacement <br /> Ore and overburden replacement. The scraper may be substituted with wheeled loader,haul truck and dozer at <br /> a similar cost. Based on 15 acres disturbance with 20,000 tons average per acre. <br /> SCRAPER TEAM WORK <br /> Overburden replacement and grading of mining phases <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D8T-8SU <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 100 100 NA NA <br /> Ownership cost/hour: $194.42 NA $124.63 $124.63 NA NA <br /> Operating cost/hour: $221.56 NA $98.71 $98.71 NA NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA NA $0.00 $0.00 NA NA <br /> Ripper op.cost/hour: NA NA $0.00 $0.00 NA NA <br /> Operator cost/hour: $37.03 NA $49.48 $49.48 NA NA <br /> Unit Subtotals: 453.02 NA $272.83 $272.83 NA NA <br /> Number of Units: 1 0 1 1 0 0 <br /> Group Subtotals: Work: $453.02 Support: $545.66 Maint: $0.00 <br /> Total work team cost/hour:$998.68 <br /> MATERIAL QUANTITIES <br /> Initial volume: 9,999 CCY Swell factor: 1.000 <br /> Loose volume: 9,999 LCY <br /> Source of estimated volume: 72"x 75'x 600'strips <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 3,400 Ibs/LCY Struck Volume: 24.00 LCY <br /> Material description: Sand and gravel -Wet Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 24.00 LCY Adjusted Capacity: 24.00 LCY <br /> 88 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.