My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-27_REVISION - M2016081 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2024-11-27_REVISION - M2016081 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 9:10:12 AM
Creation date
12/2/2024 8:21:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
11/27/2024
Doc Name Note
Exhibit A-S
Doc Name
Request For Conversion
From
AuPt Industries LLC
To
DRMS
Type & Sequence
CN2
Email Name
HR1
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT G <br /> (D) Water Discharge Management Plan <br /> Table G.(D).1- Water Discharge Management Plan addresses runoff from disturbed areas, piled materials, and <br /> operating surfaces in disturbed areas. Minimal water will be used, primarily for dust control and essential <br /> operational needs. The wash plant will recirculate water and utilize man-made containment to further <br /> minimize discharge, ensuring sustainable water management practices. <br /> TABLE G.(D).1-Water Discharge Management Plan <br /> Plan Step Component <br /> 1 Mining Block Location a Conduct an analysis of the geography and hydrology of the mining site. <br /> • Identify water sources for mining and potential runoff areas. <br /> • Consider the selection of the mining block's location with a focus on placing it to avoid all riparian habitats and other <br /> ecologically sensitive areas. <br /> 2 Wash Plant Location a Select sites with high water absorption and low run-off potential. <br /> • Avoid steep pitches,select areas that are generally flat. <br /> 3 Wash Plant Design a Avoidance of tailing and settling ponds. <br /> • Efficient use water re-circulation using manufactured water storage,dewatering and thickener technology. <br /> • Dewatering technology including dewatering cyclones,dewatering screens and press filters will be used to deliver a <br /> dry stackable tailings product. <br /> • Discharge of thickener underflow;dewatered and discharged into general sand tailings pile. <br /> • Any associated petrol chemicals will be stored in double containment. <br /> 4 Processed Ore/Stacked material 0 <br /> Selection of site based on high porosity,level ground. <br /> • Construction of bermed embankments surrounding the stacked washed ore. <br /> • Silt Fencing:Installing silt fences around the perimeter of the sand storage area can help contain sediment-laden <br /> water and prevent it from entering nearby water bodies. <br /> • Berms:berms surrounding stacked material will help redirect runoff away from sensitive areas and towards <br /> treatment or containment areas. <br /> • Water Collection:Any runoff water will be collected and for reuse in industrial processes can reduce the volume of <br /> runoff and lower the demand for fresh water. <br /> • Spill Prevention and Control:Implementing measures to prevent and control spills of oils,chemicals,or other <br /> contaminants that might mix with runoff. <br /> 5 Dewatering Operations Management a Select appropriate dewatering techniques for placer mining. <br /> • Monitor active processing operations to determine areas of water loss and improvement. <br /> • Monitor water quality. <br /> • Allow for continuous feedback from plant managers. <br /> • Log key events and metrics in a database. <br /> 6 Runoff Management for Disturbed Areas • Implement erosion control methods. <br /> • Construct sediment basins or ponds for runoff treatment. <br /> • Allow for continuous feedback from plant managers. <br /> • Log key events and metrics in a database. <br /> 7 Water Treatment for Mining Effluents a Detailed treatment processes for mining pollutants. <br /> • Use of non-toxic flocculants settling of colloids in thickener. <br /> • Monitoring,inspection,and documentation of all water treatment. <br /> • Monitor treated water to meet Colorado's standards. <br /> 8 Monitoring,Inspection,and a Rigorous monitoring of potential mining pollutants. <br /> Documentation a Maintain detailed records of treatment and water quality. <br /> 9 Post-Operation Water Management a Plan for site reclamation and stabilization. <br /> • Implement long-term water management strategies. <br /> • Seal bore holes <br /> 10 Regulatory Compliance and Reporting Adhere to Colorado mining and environmental regulations. <br /> • Develop a reporting system for local,state and federal compliance. <br /> 11 Emergency Response and Contingency a Develop a spill response plan. <br /> Plans a Procedures for notifying authorities in emergencies. <br /> 45 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.