Laserfiche WebLink
EXHIBIT E <br /> requirements. <br /> Upon completion,a final inspection of the site will ensure that all safety,environmental,and regulatory standards have <br /> been met. The photo documentation will be submitted as part of the final reclamation report,providing a detailed visual <br /> account that supports the project's commitment to safety,environmental stewardship,and returning the land to a stable, <br /> natural state suitable for future use. <br /> 5.0 Reclamation Monitoring <br /> Finally,the reclamation monitoring phase spans from the project start to five years post-mining. This continuous <br /> monitoring is essential to assess the success of the reclamation efforts,including vegetation establishment and noxious <br /> weed control,supported by regular documentation through photos and UAV mapping. <br /> 6.0 Summary Reclamation Table <br /> Table E.(Q.1, Reclamation Plan shows the reclamation process in 7 major steps. <br /> TABLE E.(C).1 RECLAMATION PLAN <br /> Step Reclamation Step Time Of Year Expected Key Activities and Details Equipment <br /> Number Time-frame <br /> 1 Year-round 2 Months a Document ground pre and post mining Dozer <br /> Site preparation for a Level ground Scraper <br /> • Stockpile topsoil Loader <br /> processing plant Lidar <br /> 2 Prepping of ore body Year-round 24 Hours per a Stripping of topsoil with a bulldozer Dozer <br /> in the mining block 5 acre block a Stockpiling topsoil along the mining block perimeter <br /> 3 Mining of block Year-round Continuous a Excavating ore from active mining block a Haul trucks <br /> with mining a Transport of ore to wash plant a Excavator <br /> • Return processed ore from the wash plant and deposit a Loader <br /> progressing towards the active excavation wall <br /> 4 Grading of mined Year-round Less than 7 a Grading processed ore that has been redeposited in the active a Dozer <br /> block days mining pit. a Scraper <br /> • Using lidar technology for land restoration a Loader <br /> • Lidar <br /> 5 Topsoil replacement Year-round Less than 7 a Covering graded area evenly with stockpiled topsoil a Dozer <br /> days a Ripping compacted areas Scraper <br /> • Loader <br /> 6 Seeding and October,April 1 Day/block a Imprinter used to texture topsoil for optimal growing conditions. a Seeder, <br /> imprinting of mining a Seeder using approved seed mix a Imprinter <br /> block a Tractor <br /> 7 Decommissioning of End of project 3 Months a Removal of all mining related equipment and facilities. a Dozer <br /> plant and facilities. a Plugging of all wells Excavator, <br /> • Loader. <br /> 8 Reclamation End of project Continuous a Monitoring of all reclamation efforts a Camera <br /> monitoring from project a Documentation of reclamation(photo,uav mapping) a Documentation <br /> start to 5 a Noxious weed treatment and control in accordance with GS a Computer <br /> years post a Database <br /> mining. <br /> 35 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />