My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-27_REVISION - M2016081 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2024-11-27_REVISION - M2016081 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 9:10:12 AM
Creation date
12/2/2024 8:21:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
11/27/2024
Doc Name Note
Exhibit A-S
Doc Name
Request For Conversion
From
AuPt Industries LLC
To
DRMS
Type & Sequence
CN2
Email Name
HR1
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E <br /> 2.1 Soil • 2.1.1 Topsoil Preservation:Remove and stockpile Silt Fencing Environmental Reduced erosion and <br /> Management, topsoil separately for use in reclamation.Ensure Geotextiles Technician sediment control <br /> Erosion and it's stored in a way that maintains its fertility and Erosion Control Blankets Detailed log of all <br /> Sediment structure. Coir Logs Mining Crew activities <br /> Control • 2.1.2 Surface Water Management:Design Track-out matts <br /> drainage systems to manage surface water flow and <br /> reduce erosion potential. <br /> • 2.1.3 Dust and Erosion Reduction:Track out mats <br /> for all major road entrances and exits.Reduction of <br /> dust with water spraying,Use of silt fencing and coir <br /> logs in critical areas. <br /> • 2.1.4 Erosion Control Plantings:Establish quick <br /> growing cover crops or grasses to control erosion <br /> and stabilize soil during and after mining. <br /> 2.2 Vegetation Progressive Reclamation:Reclaim mined areas Water Trucks Environmental Reestablishment of <br /> Management- progressively by replanting native vegetation and Vegetative Barriers Technician native species after <br /> Noxious Weed stabilizing soil as sections of the mine are completed. Windbreaks mining <br /> Management Conduct a thorough assessment of the mine site Dust Barriers Mining Crew Mowing of critical <br /> to identify existing noxious weed species and their areas to prevent <br /> distribution. sage-grouse nesting <br /> Educate all personnel on the identification of noxious and impact on <br /> weeds and the importance of weed management. migratory birds. <br /> Provide training on the best management practices Reduction and <br /> (BMPs)for weed prevention and control. eradication of <br /> Create detailed maps showing the locations of invasive plant- <br /> noxious weed infestations. species. <br /> Use mowing,cutting,or hand-pulling to control Reporting of all <br /> weeds,especiallyfor small infestations or in sensitive noxious weeds <br /> areas. Detailed log of all <br /> Ensure that equipment is cleaned to prevent the activities <br /> spread of weed seeds. <br /> Habitat Preservation:Identify and protect keywildlife Environmental Integration of mining <br /> 2.3 Wildlife habitats during mining operations.Create wildlife Technician operations minimize <br /> corridors to allow safe movement of animals. effects on local <br /> Protection Align operations to deal with The Migratory Bird Mining Crew wildlife population. <br /> Treaty Act,BLM's Greater Sage-Grouse Management Protection for Sage <br /> Plans. Grouse and migratory <br /> Use of new rolling stock with low sound signatures. birds. <br /> Bird spikes to prevent perching on high areas of the Habitat Restoration <br /> wash-plant. <br /> Re-vegetation with Native Species:Use native plant <br /> species in reclamation to restore natural habitats and <br /> support local wildlife. <br /> Environmental Regular Monitoring:Conduct regular environmental AuPT Management Early detection <br /> Monitoring monitoring during mining. Team of possible <br /> Education and Communication:Provide information Environmental environmental issues. <br /> and updates on reclamation efforts to stakeholders Technician Documentation and <br /> to build trust and support. base-lining of activity <br /> Monitor air quality with Continuous Air Monitoring Mining Crew at mine site. <br /> Stations. Environmental Data <br /> Regulatory Permitting and Approvals:Ensure all mining and AuPT Management Compliance with <br /> Compliance reclamation activities comply with local,state,and Team regulatory bodies <br /> federal regulations. Environmental <br /> Reporting:Maintain thorough documentation and Technician <br /> reporting of reclamation activities and progress to <br /> regulatory authorities. Mining Crew <br /> Mining operations will proceed throughout the year. Proactive steps for reclamation during mining will ensure a <br /> successful reclamation program. The following areas are addressed: <br /> 30 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.