My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-27_REVISION - M2016081 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2024-11-27_REVISION - M2016081 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 9:10:12 AM
Creation date
12/2/2024 8:21:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
11/27/2024
Doc Name Note
Exhibit A-S
Doc Name
Request For Conversion
From
AuPt Industries LLC
To
DRMS
Type & Sequence
CN2
Email Name
HR1
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br /> Equipment Primary Function Additional Functions <br /> Press Filter Liquid-solid separation,creation of a Produces a dry cake of solids,minimizing waste volume <br /> clay products a Recovers water for reuse in the process <br /> i <br /> Pumps Move slurry and water between a Liberation of binding clays. <br /> water components. <br /> (D) The Size Of Area(s) To Be Worked At Any One Time <br /> Mining will occur in blocks of 5-acre units.No more than 15 acres will be disturbed at any given time.See Image D.(D).1 <br /> for layout of 5-acre mining blocks.A total area of 514.9 acres will be exploited in this permit. <br /> (E) An Approximate Timetable To Describe The Mining Operation. <br /> The following Table D.(E).1 - Mining Timetable describes the major components of the mining timeline. The majority <br /> of time will be spent continuously mining and reclaiming active mining blocks. <br /> TABLE D.(E).1 - MINING TIMETABLE <br /> Stage Duration Total Time <br /> Set Up of Wash Plant-Set up of water systems,recovery systems,scrubbers,water well setup. 2 months per location Project Start <br /> Prepping of Ore Body in the Mining Block (5 acres)-stripping of topsoil. Less than one week per block to <br /> Mining of the Ore Body(5 acres)-continuously mining and reclamation mining block. Less than one month <br /> Grading of Mined Block and Covering with Stockpiled Topsoil Less than one week per block 5 Years <br /> Seeding and Imprinting of Mining Block One day per block <br /> Post Mining Environmental Monitoring Entire project length;5 years post 5 Years <br /> mining monitoring <br /> Total Project Length Less than 5 years of mining;5 10 Years <br /> years of post-mining environmental <br /> monitoring. <br /> 18 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.