My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-27_REVISION - M2016081 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2024-11-27_REVISION - M2016081 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 9:10:12 AM
Creation date
12/2/2024 8:21:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
11/27/2024
Doc Name Note
Exhibit A-S
Doc Name
Request For Conversion
From
AuPt Industries LLC
To
DRMS
Type & Sequence
CN2
Email Name
HR1
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br /> TABLE D.(A).1 THE METHOD OF MINING TO BE EMPLOYED <br /> Stage Mining Task Time <br /> 1 Prepping of Ore Body in The Stripping and stockpiling of topsoil.A dozer will be used to methodically Less than seven days <br /> Mining Block push topsoil ranging from 8"-16"in thickness to an appropriate edge of <br /> a mining block. <br /> 2 Mining of the Ore Body General Combined use of excavator,haul truck,scraper and loader to Less than one month per block <br /> systematically excavate the ore body.An excavator will creating a vertical <br /> wall and progress towards the far end of the block.Haul trucks or <br /> scrapers will move ore to mobile wash plant. <br /> Moving of Ore to Wash- County roads and temporary haul roads will be used to move ore from Continuous with the mining of the <br /> plant the active mining block to wash-plant.Haul trucks or scrapers will be block. <br /> used to used in this phase. <br /> Processing Ore at Wash- Washing and screening of excavated material.Majority of ore will be Continuous with the mining of the <br /> plant dewatered and stacked in preparation for return to active mining pit. block. <br /> Loaders and scrapers will be used. <br /> Return of Washed Ore to Use of haul truck and scrapers to return ore to active mining block. Continuous with the mining of the <br /> Active Mining Block County roads and temporary haul roads will be used to return the ore to block. <br /> the active mining block.The washed ore will systematically be replaced <br /> from the far end of the worked pit progressing towards the active wall of <br /> the mining block. <br /> 3 Grading and Contouring of A dozer will be used to grade and contour returned washed ore back Less than seven days <br /> Mined Block to original grade and contour.Lidar mapping will be used to record <br /> evaluational profiles of before and after states to ensure consistency with <br /> premined profile. <br /> 4 Return of Topsoil Over Mined Topsoil will be evenly spread over mined block.Wheel loader and/or a Less than seven days <br /> Block scraper will be used to distribute topsoil over the mined,graded and <br /> contoured block.A tractor will be used to rip and prepare topsoil for final <br /> seeding. <br /> 5 Seeding and Imprinting of Use of Seeder and Imprinter:Evenly distribute seeds and texture the One day per block <br /> Mining Block block.Schedule for seeding to occur in October or April. <br /> 15 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.