Laserfiche WebLink
-4- <br /> 12. Prima future(Post-mining)land use(check one): <br /> ft Cropland(CR) I I Pastureland(PL) I I General Agriculture(GA) <br /> n Rangeland(RL) El Forestry(FR) Wildlife Habitat(WL) <br /> t l Residential(RS) 1:1Recreation(RC) Industrial/Commercial(IC) <br /> EDeveloped Water Resources(WR) i1 Solid Waste Disposal(WD) <br /> 13. Primary present land use(check owl <br /> El Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> ii Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> ERecrResidential(RS) <br /> eation(RC) Industrial/Commercial(IC)`� Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Trackhoe and front end loaders remove material for delivery to the processing plant. <br /> 15. On Site Processing: ✓ Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Material is processed into specification aggregates using crushers, and screen plants <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> This amendment increases the mine area and reserves in the permit by 202.26 acres. The . <br /> mining method does not change but the plant site may eventually be moved to the south area <br /> when the north permit area is mined out. The final reclamation plan and reclamation methods <br /> do not change. The primary access remains as currently approved. The southern access point <br /> is - 40d05'40.41"N, 104d49'48.17"W. <br />