My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-22_REVISION - M1999120 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999120
>
2024-11-22_REVISION - M1999120 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 8:52:19 AM
Creation date
11/25/2024 8:31:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999120
IBM Index Class Name
Revision
Doc Date
11/22/2024
Doc Name
Request For Amendment To Permit
From
L.G Everist, Incorporated
To
DRMS
Type & Sequence
AM3
Email Name
NCG
JLE
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN EXHIBIT £ (CoNT) <br /> that it is spread as evenly as possible. Fertilizer and other <br /> soil amendments will be used, only if needed, in accordance with <br /> NRCS recommendations. <br /> Reclamation will begin once enough area has been opened so <br /> that any reclamation completed will not be disturbed as mining <br /> progresses. This may take one or more years depending on eco- <br /> nomic conditions and the amount of material mined. By the time <br /> mining is completed 75 to 90% of the total mined land will be <br /> reclaimed. As mining ends in each reservoir area, only backfill- <br /> ing, grading and shaping of the final mined slopes, bank armoring <br /> if needed, graveling the surface as needed. Where needed, the <br /> proposed seed mix will be planted during the next planting season <br /> after resoiling is completed. The area will be monitored for <br /> success of revegetation until accepted by the Division for re- <br /> lease. If revegetation failures occur prior to release, an <br /> analysis of the site will be made and the area will be <br /> revegetated again as necessary. <br /> Reclamation Timetable <br /> The numbers presented below represent our estimate of the <br /> various area of disturbance in the mine area. They may change as <br /> the actual mining progresses through the site. <br /> Table E-1:Reclamation Phases(9-2024) <br /> -'-TOTA0:: LAKE - GRAVEL" • • _'' MI 'R 1 <br /> .,+° �x <br /> : : r, .2�RSA-' '\`SvgrAcss=4' '4 aP ''I ,-( � <br /> F'a <br /> Phases Years : . tp '1. '.wt.,, " . , Vit:tig."''',"TptA <br /> s;; . '.tg 3,"§:4s ..' = ,, "tire . ' „ ' <br /> A.��� 14-..t'`%„-�%4: art':,- ',,,,,AZ w,n,,.,"'ea" -5 ,.t -1,5"! <br /> 441 <br /> Fort Lupton Sand and Gravel - North Area <br /> Parker-Panowicz 3-5 43.51 20.45 10.51 5.17 5.97 2.991 <br /> Swingle North 3-5 42.02 29.53 9.16 1.35 3.33 ', <br /> Fort Lupton West 3-5 47.81 41.39 6.13 1.54 0.29 , <br /> Swingle South 3-5 67.45 48.70 13.90 1.77 4.85 <br /> Sandstead 3-5 50.05 10.35 0.00 32.94 2.11 4.65 '. <br /> Blue Ribbon 3-5 55.55 37.04 10.34 1.54 8.17 <br /> Deep Lake 3-5 7.90 3.62 0.00 3.98 0.00 0.301 <br /> South Area <br /> Funakoshi 3-5 42.97 26.77 6.02 1.25 10.18 <br /> Parker #1 3-5 43.17 20.31 6.82 1.13 16.04 <br /> Adams-Parker 3-5 72.92 47.84 18.81 3.55 6.27 <br /> Parker #2 3-5 33.27 24.77 6.10 10.22 2.4011 <br /> Parker #3 3-5 43.12 29.21 10.66 2.08 3.25 <br /> Parker #4 3-5 56.94 45.22 8.95 1.68 2.771 <br /> New areas <br /> Northeast #1 3-5 70.87 53.69 10.94 1.97 6.25 <br /> Northeast #2 3-5 67.00 49.45 13.49 1.84 4.11 <br /> Northeast #3 3-5 12.12 4.22 3.57 0.70 4.331 <br /> Northwest 3-5 <br /> Totals 809.00 1 515.00 146.48 42.09 I 40.26 98.94 <br /> L.G. Everist, Inc. M-1999-120 <br /> Ft Lupton Sand and Gravel November,2024 <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.