My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-22_REVISION - M1999120 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999120
>
2024-11-22_REVISION - M1999120 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 8:52:19 AM
Creation date
11/25/2024 8:31:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999120
IBM Index Class Name
Revision
Doc Date
11/22/2024
Doc Name
Request For Amendment To Permit
From
L.G Everist, Incorporated
To
DRMS
Type & Sequence
AM3
Email Name
NCG
JLE
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D MINING PLAN <br /> Existing Conditions. <br /> The methods described and approved in the original mining <br /> and reclamation plans for the Fort Lupton Sand and Gravel Mine <br /> (FLS&G) 1999 permit, and the 2012 amendment applications will <br /> remain unchanged unless discussed in this text. The Mining Plan <br /> described in the 2004 amendment will continue be used with the <br /> only change being the direction of mining. The other change is <br /> that mining will continue to the north into the newly added areas <br /> before moving to the southern end of the permit area. <br /> The future intent is to eventually remove the southern area <br /> from this permit into a new application that is being prepared. <br /> Map Exhibits C-Current Conditions, C-1-Mining Plan, C-2-Struc- <br /> tures and F-Reclamation Plan have been provided in this packet. <br /> In the 2012 amendment, LGE combined the Fort Lupton Sand and <br /> Gravel Mine (M-1999-120) with the Lupton Meadows Reservoir (M- <br /> 2002-104) and added 7 parcels north, south and west of the exist- <br /> ing mines. From that time until 2023 the mining Phases in the <br /> middle of the permit area have been mined and reclaimed. The area <br /> that has been released has created a 2-part mine as shown on the <br /> maps. <br /> The two (2) new areas to the permit boundary will increase <br /> the permit area by approximately 202.26 acres ±. EXHIBITC -CURRENT <br /> CONDITIONS MAP shows the area being added to the permit and will <br /> reflect any changes to the Mining and Reclamation Plan in the <br /> existing area. There is very little change to the south area <br /> reclamation plan for the existing area except some of the oil and <br /> gas facilities have been removed which will allow for an expan- <br /> sion of some of the future reservoirs shapes. <br /> Nineteen of the twenty mined areas shown on the maps will be <br /> slurry wall lined and developed as a series of water storage <br /> reservoirs ranging from 10.26 to 70.00 acres ±. The exceptions <br /> are the Deep Lake Phase that will be reclaimed as a pond and the <br /> southern end of the Sandstead Phase that will be backfilled with <br /> fines 2 feet above ground water and revegetated. The north end of <br /> the Sandstead Phase may become a lined reservoir. TABLED-I -MINING <br /> TIMETABLE on Page 2 is a list of the mining phases that will be <br /> referred to in the following text. This timetable has been <br /> updated to reflect changes to existing Phases. ExHIBITB-VICINrrYMAP <br /> shows the parcels that will be added while the Mining and Recla- <br /> mation Plan Maps show how the site will be developed. <br /> The total number of phases added to the Fort Lupton Sand & <br /> Gravel Mine is four and the new area will add approximately 7-15 <br /> years to the life to the mine. It is estimated by adding the new <br /> area, along with remaining reserves, that the life of the mine <br /> will be from 15 to 25 more years. This life span is subject to <br /> fluctuation depending on market conditions. <br /> The current bond for Ft. Lupton S&G is $2, 002, 400.00. The <br /> bonds include surety for 20, 134 feet of slurry wall and construc- <br /> tion of 16, 650 feet of bank sloping. At this time the applicant <br /> has a contract with the City of Aurora to develop 5 water storage <br /> reservoirs on the northern parcels of the property. This in- <br /> cludes 256.59 acres of the existing permit area, south of Weld <br /> L.G. Everist, Inc. M-1999-120 <br /> Ft.Lupton Sand and Gravel November,2024 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.