My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-14_HYDROLOGY - M2001085 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2001085
>
2024-11-14_HYDROLOGY - M2001085 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2024 10:07:36 AM
Creation date
11/15/2024 7:34:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
Hydrology
Doc Date
11/14/2024
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
NCG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2023-2024 GSL Sand 6t Gravel Substitute Water Supply Plan Page 3 of 9 <br /> November 14, 2024 <br /> to evaporation of groundwater exposed at the site has been calculated to be 2.85 acre-feet <br /> per acre or 2.46 acre-feet for this SWSP period. A summary of the mining depletions is shown <br /> on attached Table 1. <br /> The Integrated Decision Support Group Alluvial Water Accounting System ("IDS-AWAS") <br /> model was used with the alluvial aquifer boundary condition to lag depletions to the South <br /> Platte River. The parameters shown in Table A below were used in the model. Lagged <br /> evaporative depletions are 2.47 acre-feet for this SWSP period, as shown on the attached <br /> Table 3. <br /> Table A: IDS-AWAS Parameters for the Gravel Mine <br /> X - Dist to river W - Boundary Dist Harmonic <br /> (feet) (feet) Transmissivity Specific yield <br /> (gpd/ft) <br /> 2,295 3,836 63,000 0.2 <br /> Replacements <br /> The replacement source for this plan period is fully consumable water leased from Aurora. <br /> The fully consumable water will be released to the South Platte River at the outfall of the <br /> Metro Wastewater Reclamation District's Robert W. Hite treatment facility ("Metro Sewer," <br /> WDID 0200700). Metro Sewer is located approximately 10.78 miles upstream of the site. As <br /> such, an irrigation season (April through October) transit loss of 5.39% (0.5% per mile) and a <br /> non-irrigation season (November through March) transit loss of 2.7% (0.25% per mile) will be <br /> assessed on all releases. These transit losses are subject to change by the Water <br /> Commissioner or Division Engineer. <br /> A copy of the signed lease agreement dated November 24, 2020 is attached. The term of the <br /> lease is for the period of November 1, 2020 through October 31, 2021 and is renewable for <br /> up to five additional one-year extensions provided by written notification from Aurora. <br /> According to the attached letter from Aurora (Aurora lease extension) dated September 25, <br /> 2024, the final one-year extension has been granted for the period of November 2024 <br /> through October 2025. The proposed replacement schedule is provided in Exhibit A of the <br /> delivery schedule provided with the Aurora lease extension. Total replacements to be <br />
The URL can be used to link to this page
Your browser does not support the video tag.