Laserfiche WebLink
GSL SAND AND GRAVEL MINE <br /> REPLACEMENT SCHEDULE PER LEASE WITH THE CITY OF AURORA <br /> TABLE 6 <br /> GSL SAND AND GRAVEL MINE <br /> REPLACEMENT SCHEDULE PER LEASE WITH THE CITY OF AURORA <br /> Nov 2024 through October 2025 <br /> REPLACEMENT REPLACEMENT <br /> MONTH REQUIRED TRANSIT LOSS PER TOTAL TRANSIT WATER DELIVERY <br /> (ACRE FEET) MILE(%) LOSS (%) SCHEDULE <br /> (ACRE FEET) <br /> Nov 0.24 0.25% 2.70% 0.25 <br /> Dec 0.21 0.25% 2.70% 0.22 <br /> Jan 0.18 0.25% 2.70% 0.19 <br /> Feb 0.16 0.25% 2.70% 0.17 <br /> Mar 0.15 0.25% 2.70% 0.15 <br /> Apr 0.15 0.50% 5.39% 0.16 <br /> May 0.16 0.50% 5.39% 0.17 <br /> Jun 0.19 0.50% 5.39% 0.20 <br /> Jul 0.23 0.50% 5.39% 0.24 <br /> Aug 0.26 0.50% 5.39% 0.27 <br /> Sep 0.27 0.50% 5.39% 0.29 <br /> Oct 0.27 0.25% 2.70% 0.27 <br /> TOTAL 1 2.471 1 1 2.58 <br /> DISTANCE FROM WWTP TO POINT OF DEPLETION (MILES) 10.78 <br /> Martin and Wood Water Consultants, Inc. <br /> Job No. 762.2 8/28/2024 1:29 PM <br />