My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-14_HYDROLOGY - M2001085 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2001085
>
2024-11-14_HYDROLOGY - M2001085 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2024 10:07:36 AM
Creation date
11/15/2024 7:34:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
Hydrology
Doc Date
11/14/2024
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
NCG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2023-2024 GSL Sand 6t Gravel Substitute Water Supply Plan Page 8 of 9 <br /> November 14, 2024 <br /> account for backfilling the pit. With all future SWSP renewal requests, the Applicant <br /> will be required to demonstrate continuing compliance, or diligent pursuit of <br /> compliance, with their DRMS permit reclamation plan and the April 30, 2010 DRMS <br /> letter, specifically in regard to the required financial warranty for the site. <br /> 17.The State Engineer may revoke this SWSP or add additional restrictions to its <br /> operation if at any time the State Engineer determines that injury to other vested <br /> water rights has occurred or will occur as a result of the operation of this SWSP. <br /> Should this SWSP expire without renewal or be revoked prior to adjudication of a <br /> permanent plan for augmentation, all use of water under this SWSP must cease <br /> immediately. <br /> 18. In accordance with amendments to section 25-8-202(7), C.R.S., and Senate Bill 89-181 <br /> Rules and Regulations adopted on February 4, 1992, the State Engineer shall <br /> determine whether the substitute supply is of a quality to meet requirements of use <br /> to senior appropriators. As such, water quality data or analysis may be requested at <br /> any time to determine if the water quality is appropriate for downstream water users. <br /> 19.The decision of the State Engineer shall have no precedential or evidentiary force, <br /> shall not create any presumptions, shift the burden of proof, or serve as a defense in <br /> any water court case or any other legal action that may be initiated concerning the <br /> substitute water supply plan. This decision shall not bind the State Engineer to act in <br /> a similar manner in any other applications involving other plans or in any proposed <br /> renewal of this plan and shall not imply concurrence with any findings of fact or <br /> conclusions of law contained herein, or with the engineering methodologies used by <br /> the Applicant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.