Exh. 7-23J-1 Revision Date: 10/23/23 <br /> Revision No.: TR-161 <br />EXHIBIT 7, ITEM 23, PART J <br />Section 26 Pond Sediment Control Post Mining <br /> <br />Introduction <br />Exhibit 7, Item 14 in Volume 2D describes the hydrologic methodology used in sediment pond, <br />permanent post-mine channels, and temporary conveyance channel demonstrations. Runoff curve <br />numbers assigned to the undisturbed and/or reclaimed lands in various stages of reclamation have <br />been selected in accordance with Table 1 in the Introductory Text for Exhibit 7 in Volume 2D and <br />are directly tied to Colowyo’s reclamation procedures and timing presented on Map 29B as <br />required by Rule 4.05.6(3)(a). For channels protected by a riprap liner, selection of minimum <br />riprap size is done using the Simons/OSM method in SEDCADTM. For channels to be protected <br />by a vegetative liner, the permissible velocities are also determined using SEDCADTM routines. <br /> <br />SEDCADTM demonstrations with two distinct time frames have been evaluated in detail for the <br />Section 26 Pond. Exhibit 7, Item 23, Parts C addresses sediment control for the Section 26 Pond <br />during the mining timeframe. This exhibits also contain the design criteria for all temporary <br />channels used to route surface runoff to the sediment pond. This exhibit (Exhibit 7, Item 23, Part <br />J) address sediment control during the post mining timeframe for the Section 26 Pond and provides <br />a demonstration for the post mine channel configurations. <br /> <br />Colowyo has several types of mining disturbances shown in this demonstration and in the larger <br />mining permit. The disturbance limit shown on maps and figures (a greenish colored boundary on <br />maps) is the permitted disturbance limit. This is the disturbance limit that could potentially be <br />disturbed but may not depending on mine plans and a reclamation bond has not been posted to <br />date to disturb to this limit. Volume 20, Exhibit 13C provides the cumulative bond schedule <br />disturbance limits. These disturbance limits are areas that Colowyo has permitted for disturbance <br />and posted a reclamation bond to disturbed. However, given Colowyo’s current mine plans it may <br />not have disturbed the entire area shown in Exhibit 13C. The disturbance or reclaimed areas shown <br />in this hydrology demonstration for the Section 26 Pond are actual disturbance to date combined <br />with planned future disturbances. Current mining plans do not anticipate any further ground <br />disturbances beyond these areas, especially north of the temporary out of pit spoil pile (Map 29C), <br />and on the west and end sides of the Collom Pit. Should mine plan changes occur, and additional <br />disturbance is necessary, it will be permitted and bonded for accordingly, and this hydrology <br />demonstration for the Section 26 Pond will be reevaluated prior to implementation of additional <br />ground disturbance activities not currently modeled in the Section 26 Pond watershed. <br /> <br />Section 26 Pond – Post Mining <br /> <br />The location of the Section 26 Pond and its watershed is presented on Map 41B. The profiles of <br />the associated permanent channels associated with the Section 26 Pond watershed are presented <br />on Map 33C. The temporary channels that route water to the Section 26 Pond are presented on <br />41B. Two post mine channels will be constructed in the Section 26 watershed including Lower <br />and Upper Bear Draw respectively. In the 10-Year 24-Hour and 25-Year 24-Hour modeled events, <br />Lower Bear Draw is not included as it will be reconstructed within the footprint of the Section 26 <br />Pond. A separate hydrology model demonstration is included for the post mine channel design <br />and is discussion later in this exhibit.