Laserfiche WebLink
Exh. 7-23I-3 Revision Date: 10/23/23 <br /> Revision No.: TR-161 <br />reduce peak flows from larger storm events and provide a water source to support the post mine <br />land use. <br /> <br />A SEDCADTM model (100 Year 24 Hour Channel Demonstration) has been included which <br />evaluates the peak flow for each of the channel. The minimum channel configurations for Little <br />Collom Gulch are summarized below. <br /> <br />Little Collom Gulch <br />Station Peak Flow <br />(CFS) <br />Average <br />Slope (%) <br />Channel <br />Type <br />Side <br />Slopes <br />Minimum <br />Depth <br />(Feet) <br />Erosion <br />Protection <br />Station 0+00 <br />to 10+00 <br />(LCG-1) <br />41.51 16.6 Trapezoidal <br />15’ bottom 3H:1V 4.0 Riprap, <br />D50 = 9” <br />Station 10+00 <br />to 25+00 <br />(LCG-2) <br />55.67 4.9 Trapezoidal <br />10’ bottom 3H:1V 4.0 Riprap, <br />D50 = 9” <br />Station 25+00 <br />to 55+00 <br />(LCG-3) <br />81.69 4.7 Trapezoidal <br />12’ bottom 3H:1V 4.0 Riprap, <br />D50 = 9” <br />Station 55+00 <br />to 85+00 <br />(LCG-4) <br />37.30 7.8 Trapezoidal <br />10’ bottom 3H:1V 4.0 Riprap, <br />D50 = 6” <br />Station 85+00 <br />(LCG-4) to <br />100+00 <br />40.52 7.4 Trapezoidal <br />10’ bottom 3H:1V 4.0 Riprap, <br />D50 = 6” <br /> <br />Sage Draw, Grouse Draw, Sharpie Draw, Lower, Middle, and Upper Bobcat Draws <br /> <br />Sage Draw, Grouse Draw, Dusky Draw, Sharpie Draw are tributary drainages to the reconstructed <br />portion of Little Collom Gulch, while Lower, Middle, and Upper Bobcat Draws are tributary to <br />natural tributary of Little Collom Gulch. Contributory areas to these ditches are less than one <br />square mile which would make the required modeled storm event the 10-year 24-hour storm event. <br />For ease and conservatism, all seven channels have been modeled against the 100-year 24-hour <br />storm event. <br /> <br />Lower and Middle Bobcat Draw will be constructed inside the reclaimed footprint of the Section <br />36 and Middle Ponds. Therefore, in the 100-Year 24-Hour model, it is assumed the entire <br />watersheds reporting to both ponds have been approved for Phase II bond release and both ponds <br />are no longer necessary for sediment control. In lieu of the two sediments ponds post mine channel <br />configurations have been added to the model. <br /> <br />A SEDCADTM model (100 Year 24 Hour Channel Demonstration model) has been included which <br />evaluates the peak flow for each of the channel. The minimum channel configurations for Little <br />Collom Gulch are summarized below <br />