Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Reclamation Cost Summary <br /> Permit Action: 2024 Inspection& <br /> Site: Leone Huerfano Gravel Pit TR2 Permit/Job#: M2010004 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 11/7/2024 County: Huerfano Filename: M004-000 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Grade out shorter hi hwalls to 3H:1V DOZER 1 0.12 $25 <br /> 002 Grade out hi hwalls to 3H:1V DOZER 1 27.97 $6,085 <br /> 003 Spread Topsoil 6-in over 26.05 acres DOZER 1 71.46 $15,526 <br /> 004 Reve etation of 27 acres REVEGE 1 27.00 $57,293 <br /> 004b Re-seeding and weed control on 5 acres REVEGE 1 5.00 $3,932 <br /> 005 Mob/Demob MOBILIZE 1 5.56 $4,139 <br /> SUBTOTALS: 137.11 $87,000 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $1,757 <br /> Performance bond: 1.05 Total= $914 <br /> Job superintendent: 68.56 Total= $5,434 <br /> Profit: 10.00 Total= $8,700 <br /> TOTAL O&P= $16,805 <br /> CONTRACT AMOUNT(direct+O&P)= $103,805 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $4,412 <br /> Reclamation management and/or administration: 5.00 $5,190 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $26,907 <br /> TOTAL BOND AMOUNT(direct+indirect)= $113,907 <br />