Laserfiche WebLink
-4- <br /> 12. Prim future(Post-mining)land use(check one): <br /> LI Cropland(CR) F] Pastureland(PL) fl General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) f] Recreation(RC) Industrial/Commercial{IC) <br /> EDeveloped Water Resources(WR) J__l Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one <br /> -moorCropland(CR) _ Pastureland(PL) �. General Agriculture(GA) <br /> _ Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) U Recreation(RC) II Industrial/Commercial(IC) <br /> © Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): Dredge equipped with a cutter head <br /> & suction to remove solids as slurry from reservoir bottom & pumped to dewatering ponds - See <br /> Exhibit D - Mining Plan. <br /> 15. On Site Processing: crushing/sarecninSlurry is currently being dewatered using settling ponds <br /> 13.1 Briefly explain mining method(e.g.ttuck/shovel):and a vortex cyclone. Future plans are to install a sand <br /> plant. Dewatered material is hauled and placed in stockpiles. See Exhibit D - Mining Plan. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> N/A <br />