Laserfiche WebLink
A ERC <br /> Table of Contents <br /> 1.0 MINING METHOD 3 <br /> 2.0 DEPOSIT TO BE MINED 5 <br /> 3.0 INTENDED USE OF MINED MATERIALS 9 <br /> 4.0 MATERIAL HANDLING 9 <br /> 4.1 Settling Ponds 10 <br /> 4.2 Stockpiles 11 <br /> 4.3 Future Plant Operation 13 <br /> 5.0 PROJECT TIMEFRAME 14 <br /> 6.0 HAUL ROADS 16 <br /> 7.0 REFERENCES 16 <br /> List of Tables <br /> Table 2.1: PARTICLE SIZE ANALYSIS RESULTS—2019 AND 2022 TESTING 8 <br /> Table 4.1: STOCKPILE GEOMETRY 12 <br /> List of Figures <br /> Figure 1.1: Existing and Year 1 Operations Process Flow Diagram 4 <br /> Figure 1.2: Future Operations Process Flow Diagram 4 <br /> Figure 2.1: 2019 Drill Hole and 2022 Test Pit Locations 7 <br /> Figure 2.2: 2024 Dredge Material Particle Size Analysis 8 <br /> Figure 4.1: Settling Pond Outlet Schematic 11 <br /> Figure 4.2: Stockpile Development Constructed from Cyclone Underflow 12 <br /> 2 <br />