Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#005 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Spread 8"of tospoil over 8.79 acres <br /> Robinson Sons Gravel Pit No. Permit Action: <br /> Site: 1 2024 ReCalc Permit/Job#: M2008076 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado Abbreviation: None <br /> Date: 10/4/2024 County: Las Animas Filename: 5 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $173.32 NA <br /> Operating Cost/Hour: $109.71 100 <br /> Ripper own. $0.00 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $38.59 NA <br /> Total unit Cost/Hour: $321.62 <br /> Total Fleet Cost/Hour: $643.23 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 9,501 <br /> Swell factor: 1.000 <br /> Loose volume: 9,501 LCY <br /> Source of estimated volume: 8.79 ac(A 1-3 &scale)of tot 28.56 ac dist.not inc. <br /> roads <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly 1,400.0 LCY/hr <br /> production: <br /> Materials consistency description: Loose stockpile 1.2 <br /> Average push 0% <br /> gradient: <br /> Average site altitude: 6,915 feet <br /> Material weight: 1,600 lbs/LCY <br /> Weight description: Top Soil <br />