Laserfiche WebLink
EXHIBIT 13C <br />Volume 20 Page 17 Revision Date: 7/11/23 <br /> Revision No.: MR-248 <br /> <br /> <br /> <br /> <br /> <br />Table 13C-26 Collom Pit and Temporary Spoil Pile Revegetation <br />Area Acres to be Reseeded <br />Collom Pit & <br />Temporary Spoil Pile <br />907.5 <br /> <br />Table 13C-27 Topsoil Stockpile Revegetation <br />Topsoil Stockpile <br />Number Acres to be Reseeded <br />25A 50.9 <br />26B 2.2 <br />26A 24.2 <br />36A 4.1 <br />2A 18.2 <br /> <br />Table 13C-28 Collom In-Pit Drill Holes <br />Drill Hole Number Plugging <br />Requirements <br />Please see Exhibit 27, Item 3 <br /> <br />Table 13C-29 Collom Pit Power Distribution <br />Task <br />Remove Power Lines 16,897 Feet <br />Topsoil Replacement 25,000 Cubic Yards <br />Reseed Disturbance 10.7 Acres <br /> <br /> <br />