Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br />November 7, 2024 <br /> <br /> <br />Eric Leigh <br />Monarch Mountain Minerals and Aggregates, LLC <br />5 Concourse Pkwy Suite 1900 <br />Atlanta, GA 30328 <br /> <br /> <br />Re: Monarch DENM Mine - File No. M-2022-009 <br /> Monarch Mountain Minerals and Aggregates, LLC <br /> Technical Revision (TR-2) <br /> Technical Revision to update the Mining and Reclamation Plan maps to account for an oil <br />and gas pad and a new slurry wall cell. <br /> <br />Dear Eric Leigh: <br /> <br />On November 7, 2024 the Division of Reclamation, Mining and Safety concluded its review of the <br />Technical Revision application submitted to the Division on October 28, 2024, addressing the <br />following: <br /> <br />The Operator is going to add a new slurry wall lined cell, 2B, to offset area lost by the addition of an <br />oil and gas pad located between Cells 3 and 4. The revision provided an update to the groundwater <br />flow model. To offset the newly modeled impacts an additional underdrain will be installed. <br /> <br />The decision reached by the Division is: approve. <br /> <br />The terms of Technical Revision No. 2 approved by the Division are hereby incorporated into Permit <br />No. M-2022-009. All other conditions and requirements of Permit No. M-2022-009 remain in full <br />force and effect. <br /> <br /> <br />Bond Held: $4,303,166.27 <br />Prior Liability: $4,303,166.27 <br />Change in Liability: $0.00 <br />Revised Liability: $4,303,166.27 <br />Prior Permit Acreage: 545.90 <br />Change in Permit Acreage: 0.00 <br />Revised Permit Acreage: 545.90 <br />Prior Affected Acreage: 545.90 <br />Change in Affected Acreage: 0.00