Laserfiche WebLink
Bulldozer Worksheet Cont’d Task # 029 Page 1 of 2 <br /> <br /> <br />BULLDOZER WORK <br /> <br />Task description: Regrade Haul Road A Upper and Lower Ditch <br />Site: Colowyo Coal Mine Permit Action: RN8 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 029 State: Colorado Abbreviation: None <br />Date: 8/17/2022 County: Moffat Filename: C019-029 <br />User: ZTT <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D11T - 11U <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $257.09 NA <br />Operating Cost/Hour: $273.21 100 <br />Ripper own. Cost/Hour: $0.00 NA <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $41.30 NA <br />Total unit Cost/Hour: $571.60 <br />Total Fleet Cost/Hour: $571.60 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 642 <br />Swell factor: 1.000 <br />Loose volume: 642 LCY <br />Source of estimated volume: Exhibit 7-23B, Table 1, Exh. 7-item 23, Fig. B-1 <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 4,589.5 LCY/hr <br /> <br />Materials consistency description: Compacted fill or embankment 0.9 <br /> <br />Average push gradient: -5 % <br />Average site altitude: 7,500 feet <br /> <br />Material weight: 2,650 lbs/LCY <br /> <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.)