My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-24_PERMIT FILE - C1981019 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2023-07-24_PERMIT FILE - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2024 9:00:47 AM
Creation date
11/7/2024 8:57:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
7/24/2023
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont’d Task # 024 Page 2 of 2 <br /> <br /> <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 1.000 (DOZ-OC) <br />Push gradient: 0.903 (CAT HB) <br />Altitude: 0.930 (CAT HB) <br />Material Weight: 0.894 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.5047 <br /> <br />Adjusted unit production: 787.33 LCY/hr <br />Adjusted fleet production: 3149.32 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.770/LCY <br /> <br />Total job time: 2.36 Hours <br />Total job cost: $5,712 <br />
The URL can be used to link to this page
Your browser does not support the video tag.