Laserfiche WebLink
Truck/Loader Worksheet Cont’d Task # 019 Page 3 of 3 <br /> <br />CIRCES Cost Estimating Software <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 815.00 -5.50 2.00 -3.50 2545 0.433 <br />Haul Time: 0.433 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 815.00 5.50 2.00 7.50 2327 0.757 <br />Return Time: 0.757 minutes <br />Total Truck Cycle Time: 4.670 minutes <br />Loading Tool unit <br />Production <br /> <br />4,603.46 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />3,820.87 <br /> <br />LCY/Hour <br />Truck Unit Production <br />2,247.31 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />1,865.26 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 3,730.53 LCY/Hour <br />Adjusted single truck/loader team production: 3,730.53 LCY/Hour <br />Adjusted multiple truck/loader team production: 3,730.53 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 228.26 Hours <br /> <br />Unit cost: <br /> <br />$1.041 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$886,013 <br />