Laserfiche WebLink
Truck/Loader Worksheet Cont’d Task # 018 Page 3 of 3 <br /> <br />CIRCES Cost Estimating Software <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 1973.00 -8.00 2.00 -6.00 1870 1.199 <br />Haul Time: 1.199 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 1973.00 8.00 2.00 10.00 1789 1.389 <br />Return Time: 1.389 minutes <br />Total Truck Cycle Time: 6.068 minutes <br />Loading Tool unit <br />Production <br /> <br />4,603.46 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />3,820.87 <br /> <br />LCY/Hour <br />Truck Unit Production <br />1,729.52 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />1,435.50 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 4,306.50 LCY/Hour <br />Adjusted single truck/loader team production: 3,820.87 LCY/Hour <br />Adjusted multiple truck/loader team production: 3,820.87 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 408.17 Hours <br /> <br />Unit cost: <br /> <br />$1.137 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$1,772,716 <br />