Laserfiche WebLink
Truck/Loader Worksheet Cont’d Task # 007 Page 3 of 3 <br /> <br />CIRCES Cost Estimating Software <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 1172.00 -9.00 2.00 -7.00 1411 1.033 <br />Haul Time: 1.033 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 1172.00 9.00 2.00 11.00 1734 1.079 <br />Return Time: 1.079 minutes <br />Total Truck Cycle Time: 5.592 minutes <br />Loading Tool unit <br />Production <br /> <br />4,603.46 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />3,820.87 <br /> <br />LCY/Hour <br />Truck Unit Production <br />1,876.75 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />1,557.70 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 3,115.40 LCY/Hour <br />Adjusted single truck/loader team production: 3,115.40 LCY/Hour <br />Adjusted multiple truck/loader team production: 3,115.40 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 383.90 Hours <br /> <br />Unit cost: <br /> <br />$1.246 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$1,490,152 <br />