Laserfiche WebLink
Findings of the Colorado Division of Reclamation, Mining and <br /> Safety for the Keenesburg Strip Mine <br /> Explanation of Findings <br /> Pursuant to Rule 2.07.6(2) of the Regulations of the Colorado Mined Land Reclamation Board <br /> for Coal Mining, and the approved state program, the Division of Reclamation, Mining and <br /> Safety or the Board must make specific written findings prior to issuance of a permit, permit <br /> renewal, or permit revision. These findings are based on information made available to the <br /> Division that demonstrates that the applicant will be able to operate in compliance with the <br /> Colorado Surface Coal Mining Reclamation Act and the Regulations promulgated pursuant to <br /> the Act. <br /> The findings in the following sections required by Rule 2.07.6(2) are listed in accordance with <br /> that Rule. The findings and specific approvals required pursuant to Rule 2.07.6(2)(m) are listed <br /> in accordance with Rule 4 and are organized under subject or discipline subtitles. <br /> This findings document has been updated for this permit revision (PR-03). The following <br /> findings have been reevaluated and updated if necessary to reflect changes which will occur as a <br /> result of this permit revision. <br /> Section A - Rule 2.07.6 <br /> 1. The permit application is accurate and complete. All requirements of the Act and these <br /> rules have been complied with [2.07.6(2)(a)]. <br /> 2. Based on information contained in the permit application and other information available <br /> to the Division, the Division finds that surface coal mining and reclamation can be feasibly <br /> accomplished at the Keenesburg Strip Mine [2.07.6(2)(b)]. <br /> 3. The assessment of the probable cumulative impacts of all anticipated coal mining in the <br /> general area on the hydrologic balance, as described in 2.05.6(3),has been made by the <br /> Division. This assessment entitled "Cumulative Hydrologic Impact Assessment <br /> Boulder/Weld Coal Field CHIS Coors-Keenesburg," is available for inspection at the <br /> offices of the Division. The Division finds that the operations proposed under the <br /> application have been designed to prevent damage to the hydrologic balance outside the <br /> proposed permit area. Please refer to Section B.V. of this document(Hydrologic Balance) <br /> for additional discussion of the predicted hydrologic consequences of mining operations at <br /> the Keenesburg Strip Mine [2.05.6(3) and 4.05]. <br /> 4. The Division finds that the affected area is, subject to valid rights existing as of August 3, <br /> 1977,not within: <br /> Keenesburg Strip Mine Page 6 <br /> October 2024 Findings for PR-03 <br />