Laserfiche WebLink
-4- <br /> 12. Prima future(Post-mining)land use(check one): <br /> L.) Cropland(CR) D Pastureland(PL) General Agriculture(GA) <br /> t i Rangeland(RL) El Forestry(FR) Wildlife Habitat(WL) <br /> i Residential(RS) n Recreation(RC) Industrial/Commercial(IC) <br /> nDeveloped Water Resources(WR) fJ Solid Waste Disposal(WD) <br /> 13. Primary present land use(check oil& <br /> ElCropland(CR) -am Pastureland(PL) ` General Agriculture(GA) <br /> n Rangeland(RL) ._ Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) 11 Recreation(RC) II Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> loaders, dozers, and haul trucks <br /> 15. On Site Processing: IN Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> excavators, trucks, dozers extracting sand/gravel <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> none <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br />