My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-04_PERMIT FILE - M2024056 (6)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024056
>
2024-11-04_PERMIT FILE - M2024056 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 8:54:38 AM
Creation date
11/5/2024 10:46:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024056
IBM Index Class Name
Permit File
Doc Date
11/4/2024
Doc Name
Application
From
Asphalt Specialties Co., Inc
To
DRMS
Email Name
NCG
JLE
EL1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pitside slope during flood events. These structures are of a design approved for use by the Mile <br /> High Flood District. Details of the inflow/outflow structure are shown on Map F-2. <br /> 6.2. Disturbed Area Runoff <br /> During all stages of mining, there is enough water storage capacity to contain the 5-year and <br /> 100-year 24-hour storm events and prevent erosion from surface water discharge. The <br /> expected rainfall from these events at the Evans Site is provided in Table G-2 below. <br /> Table G-2. Area Storm Events (from NOAA2) <br /> Event Probability Event Rainfall <br /> (inches) <br /> 100-YR 24-HR 4.74 <br /> The peak runoff was generated from these values for the three drainage basins during all <br /> stages of mining. Pre-mine, mining, and reclamation conditions are delineated on the Drainage <br /> Map. The discharge volumes from these storm events are calculated in Appendix G-1 at the end <br /> of this exhibit. Table G-3 summarizes the runoff volumes and storage volumes for each <br /> drainage. All drainage calculations were made using the Rational Method identified in the Mile <br /> High Flood Control District. <br /> Table G-3. Drainage Calculations <br /> Drainage Basin Runoff& Destination <br /> Drainage Phase of Area Runoff 100-YR 24- Detention Discharge Flow <br /> Basin Operation (ac) Coefficient HR Runoff Capacity Rate(gpm)* <br /> (ac-ft) (ac- <br /> ft)*** <br /> 1 Baseline 39.8 0.23 1.41 N/A 0 <br /> Mining 0.37 2.64 500+ 1000-3000** <br /> Reclamation 0.59 4.21 43 0 <br /> Reclamation 0.23 1.41 N/A 0 <br /> Alternative <br /> 2 Baseline 120 0.22 4.42 N/A 0 <br /> Mining 0.4 8.60 2000+ 1000-3000** <br /> Reclamation 0.7 16.75 156 1 0 <br /> Reclamation 0.21 4.21 N/A 0 <br /> Alternative <br /> *The discharge flow rate is calculated from the peak discharge of the 100-Yr 24-Hr storm event. <br /> **Discharge flow rate is variable and controlled during mining as all discharges are pumped from the pit <br /> ***Detention Capacity calculated in CAD as volume in pit or volume above water storage. <br /> 2 National Oceanic and Atmospheric Administration <br /> Evans Mining Resource <br /> October 2024 G-4 1:1Lewicki ik Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.