Table E-4 Alternative Reclamation Volumes <br /> Material Available on Site Requirements for Reclamation <br /> Reclamation Area Topsoil Overburden Topsoil Pit Backfill <br /> Area (acres) Stripped(CY) Stripped(CY) Required(CY) Required(CY) <br /> Phase 2 Pod 21.4 20,150 103,550 20,150 1,003,650 <br /> Phase 3+4 Pod 36.4 34,250 176,200 34,250 1,742,150 <br /> Phase 5+6 Pod 41.5 39,050 200,850 200,850 1,869,950 <br /> Total 99.3 93,450 480,600 93,450 4,615,750 <br /> 3. Topsoil Replacement <br /> An average 6-8 inches of topsoil will be stripped and stockpiled prior to mining. After backfilling <br /> and grading has been completed during reclamation, topsoil will be replaced at an average <br /> depth of 6-8 inches in a manner that is similar to the pre-mine soil profile. Topsoil will only be <br /> placed on the pond slopes and other surrounding disturbances. Topsoil will not be replaced on <br /> the pond floors. Replaced topsoil will be directly placed by loaders and haul trucks. All topsoiled <br /> areas will be disced to aid in root penetration. <br /> 4. Haul Roads and Access <br /> All internal haul roads will remain following reclamation to support the future land use. <br /> 5. Reclamation Timetable and Sequence <br /> The sequence and timing of reclamation can be seen in Table E-4 below. The reclamation <br /> schedule is dependent on the rate of mining and fluctuating market demands. The operator will <br /> reclaim the site concurrently with the progression of mining to limit the total disturbance. <br /> Table E-4 Reclamation Timetable <br /> Description Time Required <br /> Construction of slurry wall A. 2 months <br /> Initial stripping of Phase 1&2. 1 month <br /> Mine and reclaim Phase 2 according to approved 4.5 years <br /> plans.Reclamation occurs as mining has reached its <br /> maximum extents in an area. <br /> Construction of slurry wall B. f 2 months <br /> Initial stripping of Phase 3/4. 1 month <br /> Mine and reclaim Phase 3&4 according to approved 8 years <br /> plans.Reclamation occurs as mining has reached its <br /> Evans Mining Resource <br /> October 2024 E-3 Lewicki&Associates <br />