Laserfiche WebLink
COU O R A D O <br /> ��� Division�R����' <br /> ��� Mining and Safety <br /> / Department mNatural Resources <br /> MINING AND RECLAMATION PERMIT <br /> CONSTRUCTION MATERIAL MINING OPERATIONS <br /> PenniiNumnher: M-2824-032 <br /> Type ofPennit: 112u <br /> Permit Date: October 3\, 2U24 <br /> (Anniversary date for annual report and fees <br /> THIS PERMIT is issued 6v the Mined Land Reclamation Board, Department nfNatural Resources, State <br /> of Colorado. <br /> RECITALS <br /> A. The Penniitee, Connell Resources, Inc., desires to conduct a mining operation known as 5.1 Pit, for the <br /> purpose ofextracting Sand and gravel. Unless this permit im modified ora separate permit iu issued 0m <br /> cover the mining and/or recovery of other minerals or extractive producta,thepcnoittcewi|\ not mine <br /> wr recover any other commodities ui this site. <br /> B. On October |8,2U24the Mined Land Reclamation Board(0oard)approved the Pcmnittee'm <br /> application for this permit, fisedthe amount of the financial warranty and directed that this permit be <br /> issued upon the filing with the Division of Reclamation, Mining and Safety (Divioion)nfpedhnmuncc <br /> warranty and financial warranty(or warranties) in the amount so fixed in form and substance <br /> approved 6v the Division. Said warranties have been fi\edwith the Division. <br /> C. If the Permittee desires to extract materials other than those listed in(A), a separate pen-nit or a pen-nit <br /> modification may harequired. <br /> D. On October l8, 2024 the Board made the following findings: <br /> |. The application for this permit complies with the requirements of the Colorado Mined Land <br /> Reclamation Act for the Extraction ofConstruction Mo1aria|m,C.R.8. 3432.5 101 etueq.,om <br /> amended, and with all applicable local, state and federal laws; <br /> 2. The operation will not adversely affect the stability of any significant, valuable, and permanent <br /> man made structure located within two hundred feet of the Affected Land, except where there is <br /> an agreement between the Operator and the persons having an interest in the structure that <br /> damage to the structure is to be compensated for by the Permittee or if such an agreement cannot <br /> be reached, an engineering analysis establishes no damage will occur to the structure to the <br /> satisfaction of the Division;and; <br /> , <br /> 3. The proposed mining and reclamation operations can be carried out in confon-nance with the <br /> requirements of the Act, and the Construction Material Rules and Regulations. <br />