Laserfiche WebLink
Parcel: IC23 <br /> 1 <br /> 0 0�50 <br /> 6� <br /> Lagand <br /> —OMSCatw 1023 <br /> Vapper Comm Map 7 SL25 <br /> A <br /> Pm� <br /> No Name O-9. <br /> 2 <br /> Map 4. Elevation Comparison Map for Parcel IC23, backfilled and graded in 2023. <br /> The parcel is located east of the No Name drainage and slopes downgradient to the west. <br /> The following elevation comparison for D Pit parcel, DAB23 comprising 284.9 acres shows a <br /> discontinuity in the contour lines towards the top (south) of the parcel. As explained above, this is <br /> due to collection problems over the southern portion of the parcel leading to poor quality outputs from <br /> the obvious discontinuity in the upper(south)portion of the parcel. DRMS did not rely upon this data <br /> discontinuity for quantitative purposes. However, DRMS field verified this area on foot comparing <br /> the M12 and M1 and M2 maps. DRMS finds TMI's M1 and M2 topography is accurate for the bond <br /> release block, and a significant topographical deviation was not observed in this area. Therefore, the <br /> Division is very confident this area is also accurately depicted on Trapper's M1 map and is in <br /> compliance with the approve post-mine topography. <br /> Permit Number C 19810 10 Prepared by: R.Reilley <br /> SL25 Page 12 of 21 <br />