Laserfiche WebLink
(Bowie 90 LD- <br /> Subtotals: $1,732.83 $678.02 $1,750.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/ Cost/hr/ <br /> fleet fleet <br /> Light Duty Pickup, 4x4, $97.64 1 $97.64 $97.64 <br /> 3/4 T. <br /> Fuel Tanker, 6x4, 210 $75.02 1 $75.02 $75.02 <br /> HP <br /> Lube Truck, 6x4, 250 HP $75.02 1 $75.02 $75.02 <br /> Subtotals: $247.68 $247.68 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: ALAMOSA <br /> Total one-way travel distance: 5.00 miles <br /> Average Travel Speed: 45.00 mph <br /> Total Non-Roadable Mob/Demob Cost * $11,660.20 <br /> two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost <br /> ** one round trip, no haul rig: $55.04 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time (Hours): 0.11 0.11 <br /> Return Time (Hours): 0.11 0.11 <br /> Loading Time (Hours): 1.10 NA <br /> Unloading Time (Hours): 1.10 NA <br /> Subtotals: 2.42 0.22 <br /> JOB TIME AND COST <br /> Total job time: 4.84 Hours <br /> Total job cost: $11,715 <br /> Page 17 of 17 <br />