Laserfiche WebLink
Source of estimated Spread 6" over 31.79 acres <br /> volume: <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly 2,110.5 LCY/hr <br /> production: <br /> Materials consistency Partly consolidated stockpile 1.1 <br /> description: <br /> Average push 0 % <br /> gradient: <br /> Average site 7,500 feet <br /> altitude: <br /> Material weight: 1,600 lbs/LCY <br /> Weight Top Soil <br /> description: <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 AVG. <br /> Material consistency: 1.100 CAT HB <br /> Dozing method: 1.000 GEN. <br /> Visibility: 1.000 AVG. <br /> Job efficiency: 0.830 1 SHIFT/DAY <br /> Spoil pile: 0.800 FND-RF <br /> Push gradient: 1.000 CAT HB <br /> Altitude: 1.000 CAT HB <br /> Material Weight: 1.438 CAT HB <br /> Blade type: 1.000 PAT <br /> Net correction: 0.7877 <br /> Adjusted unit 1,662.44 LCY/hr <br /> production: <br /> Adjusted fleet 3324.88 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.287/LCY <br /> Total job time: 7.71 Hours <br /> Total job cost: $7,347 <br /> Page 11 of 17 <br />