Laserfiche WebLink
Fleet size: 1 Excavator Total job time: 203.05 Hours <br /> Unit cost: $0.876 /LCY Total job cost: $105,130 <br /> AIR TOOLS AND EQUIPMENT <br /> Task description: Break up structural fill remove non-inert material <br /> Site: Alamosa Pit No. 2 Permit Action: Inspection 2024 Permit/Job#: M1983175 <br /> PROJECT IDENTIFICATION <br /> Task#: 001B State: Colorado Abbreviation: None <br /> Date: 10/8/2024 County: Alamosa Filename: M175-00lb <br /> User: JLE <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Air Tool: Jackhammer, dry - 55 lbs. Horsepower: 42 <br /> Compressor: Air compressor, diesel - 130 cfm Shift Basis: 1 per day <br /> Labor Unit 1: Laborer- Jackhammer Weight: 1.18 <br /> Labor Unit 2: (US Tons) <br /> Cost Breakdown: <br /> Utilization % <br /> Ownership Cost/Hour: $27.09 NA <br /> Operating Cost/Hour: $21.74 100 <br /> Operator Cost/Hour: $22.07 NA <br /> Total Unit Cost/Hour: $70.90 <br /> Total Fleet Cost/Hour: $70.90 <br /> JOB TIME AND COST <br /> Fleet size: 1 Equipment Set(s) Total job time: 203.05 Hours <br /> Unit cost: $70.90 /Hour Total job cost: $14,396 <br /> Page 4 of 17 <br />