Laserfiche WebLink
2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING ACTIVITIES B <br />MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS. <br /> <br /> <br />RN-08 60-d 03/23 <br />Unit Train Loadout and Highway Stockpile <br /> <br />The Highway Stockpile was temporarily stabilized during 2002. <br /> <br />Reclamation work was performed from September 2006 through November <br />2006 at the unit train loadout. The truck dump, silos, loadout and associated <br />structures and conveyors were dismantled and removed from the site. <br />Concrete foundations were removed to at least the level of existing grade. <br />Concrete from the silos and other structures was crushed and stockpiled on <br />site. This crushed concrete has subsequently been utilized by the Operator. <br /> <br />The Operator's annual reclamation reports provide additional details regarding <br />the dates reclamation was completed. <br />