My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-09-10_PERMIT FILE - C1981038 (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2024-09-10_PERMIT FILE - C1981038 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 11:29:35 AM
Creation date
10/18/2024 11:26:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
9/10/2024
Section_Exhibit Name
Volume 7 2.05 Operation and Reclamation Plans Paonia Loadout
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. The MCC building located adjacent to the <br />western most silo controlled the bag houses, feeders <br />and hoist systems of the silo system. It was masonry <br />in construction with a metal roof and a poured <br />concrete slab floor/foundation. This MCC was <br />approximately 20 feet long by 15 feet wide and 10 feet <br />tall. <br />Reclamation Status: Removed from site. Reclamation <br />activities occurred in 2007. <br />4. The MCC building located adjacent to the truck <br />dump controlled the bag houses, feeders and silo <br />elevating conveyor. It was masonry in construction <br />with a metal roof and a poured concrete slab <br />floor/foundation. This MCC was approximately 30 feet <br />long by 15 feet wide and 10 feet tall. <br />Reclamation Status: Removed from site. Reclamation <br />activities occurred in 2007. <br />14. De-icer storage tanks(2) <br />The two storage tanks located at the train loadout <br />supplied deicer and a side release agent, both of which <br />are applied to coal shipments at the customers <br />request. One tank had a volume of 3,500 gallons and <br />the other tank had a volume of 15,000 gallons. Both <br />tanks were double wall polypropylene construction and <br />set directly on the ground, and were more or less <br />portable. <br />Reclamation Status: De-icer tanks have been removed <br />from site. Reclamation activities occurred in 2007. <br />15. Fueling Station No. 1 <br />This fueling station consists of two standard mounted <br />RN -07 2.05-12 02/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.