My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-09-10_PERMIT FILE - C1981038A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2024-09-10_PERMIT FILE - C1981038A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 11:30:56 AM
Creation date
10/18/2024 10:05:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
9/10/2024
Section_Exhibit Name
Volume 7 2.05 Operation and Reclamation Plans Paonia Loadout
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TR-66 2.05 - 25 08/24 <br />12. Coal Stockpile Area: Excess material placed in the coal stockpile area <br />will be graded to a smooth uniform surface. Some of the excess <br />material will be stockpiled to be used to fill the Black Bridge Road <br />Culvert and for use in filling the sediment pond. The regraded areas will <br />be seeded and mulched. (3 weeks) <br /> <br />13. Black Bridge Road Culvert: The large multi-plate culvert will be filled <br />with compacted soil. (2 weeks) <br /> <br />14. Sediment Ponds: The sediment pond at the highway stockpile will be <br />reclaimed after vegetation has been established and DRMS has <br />approved their removal. (2 weeks). The larger sediment pond at the east <br />end of the Loadout property will be reclaimed under Technical Revision <br />No. 66. <br /> <br />15. Loadout Wells: The three loadout wells will be sealed. (1 week) <br /> <br /> <br />(b) Cost estimate for the reclamation with calculations. <br /> <br />A detailed estimate of the cost of reclamation of the proposed mine and mine <br />facilities is presented in Section 3.05 Performance Bond Requirements. <br /> <br />(c) A plan for backfilling, soil stabilizing, compacting, and grading. <br /> <br />The mine loadout area was constructed using approximate balanced cut and <br />fill technique. To reclaim the areas to approximate original contour, the fill <br />placed on the outslopes must be returned to the cut slopes. The Postminig <br />Topography Map No. 8A shows the final contours of the land. <br /> <br />(d) A plan for removal, storage and redistribution of topsoil. <br /> <br />The site construction occurred before rules requiring the salvage of <br />topsoil were promulgated. Available topsoil will be re-distributed over <br />the re-contoured site. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.