Laserfiche WebLink
2.05.1 Objective. <br />No answer required. <br />2.05.2 Operation Plan - Estimated Area for Life of Operation. <br />Coal produced from the Bowie No. 2 Mine was previously trucked to the <br />loadout near Paonia. The loadout handled up to 5 million tons per year of <br />coal produced from the Bowie No. 1 and No. 2 Mines and/or other mines <br />in the area. The coal was then loaded into unit trains and shipped to its <br />final destination, typically a mid -western coal fired power plant. No <br />additional disturbance is anticipated at the loadout. The loadout is <br />capable of handling the required coal throughput so no expansion was <br />required. <br />RN -07 2.05-1 03/18 <br />