Laserfiche WebLink
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://drms.colorado.gov <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Michael A. Cunningham, Director <br />October 16, 2024 <br /> <br />Graham C. Roberts <br />Trapper Mining, Inc. <br />P.O. Box 187 <br />Craig, CO 81626 <br /> <br /> <br />Re: Trapper Mine (Permit No. C-1981-010) <br /> Permit Revision Application No. 12 (PR-12) <br /> PR-12, L-Pit Additional Cut and AOC Change <br /> <br /> <br />Dear Mr. Roberts: <br /> <br />We have received your application to revise your permit to conduct coal mining in Colorado. Our <br />initial review indicates that all preliminary items required by the Colorado Surface Coal Mining <br />Reclamation Act, Section 34-33-101 et seq., C.R.S., have been submitted. Thus, your revision <br />application has been considered complete for the purposes of filing as of October 16, 2024. All <br />review and comment periods as provided in the Act and the Regulations initiate from this date of <br />filing. <br /> <br />Unless notification to the contrary accompanies this letter, the proposed newspaper advertisement <br />submitted with the application has been found to be satisfactory. You should commence publication <br />of this advertisement as specified in Rule 2.07.3(2) of the Regulations. Proof of the publication of <br />the advertisement must be filed with the Division no later than four weeks after the last publication <br />date. <br /> <br />Coincident with the publication, a copy of the revision application, less confidential items, must be <br />filed for public inspection with the appropriate public office as specified by you in the notice. Any <br />subsequent changes or additions to the application must also be made in this copy, at the same time <br />it is submitted to the Division. <br /> <br />This revision application may not constitute a Mining Plan Action. Should, however, the revision <br />change significantly during the course of the Division’s review, the need for modification of your <br />federal mine plan could at that time be deemed necessary. <br /> <br />The Division is currently reviewing your revision application to determine whether the items you <br />have submitted are adequate in terms of meeting the requirements of the Act and Regulations. <br />Additional information may be required, and in accordance with the provisions of Section