Laserfiche WebLink
-4- <br /> 12. Prima future(Post-mining)land use(check one): <br /> Cropland(CR) n Pastureland(PL) General Agriculture(GA) <br /> 171 Rangeland(RL) n Forestry(FR) Wildlife Habitat(WL) <br /> nResidential(RS) In Recreation(RC) Industrial/Commercial(IC) <br /> J1Developed Water Resources(WR) jj Solid Waste Disposal(WD) <br /> 13. Primary present land use(check miiar <br /> Cropland(CR) Pastureland(PL)-tamp General Agriculture(GA) <br /> Rangeland(RL) - Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water ResourcesR (WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Wet pit surface mine with excavators, trucks, loaders, etc. <br /> 15. On Site Processing: ✓ Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Loader to crusher <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br />