My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-10-15_PERMIT FILE - M2024053 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024053
>
2024-10-15_PERMIT FILE - M2024053 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 9:19:49 AM
Creation date
10/16/2024 9:10:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024053
IBM Index Class Name
Permit File
Doc Date
10/15/2024
Doc Name
Application
From
Mid-States Materials, LLC
To
DRMS
Email Name
BEH
ZTT
EL1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table G-1. Surface Water Discharge Monitoring Requirements in NPDES Discharge <br /> Permit <br /> Parameter Monitoring Frequency Sample Type <br /> Flow Instantaneous, Monthly In-situ <br /> pH 2x/month Grab <br /> Total Suspended 2x/month Grab <br /> Solids <br /> Oil and Grease Visual 2x/month Visual <br /> Oil and Grease Contingent on visibility Grab <br /> of oil and grease <br /> Total Flow Instantaneous, Monthly Calculated <br /> Selenium,Potentially 2x/month Grab <br /> Dissolved <br /> Total Dissolved Solids Quarterly Grab <br /> Note:these are the anticipated analytes based on operator experience at similar sites.CDPHE may issue <br /> different sampling requirements with the permit. <br /> 3. Floodplain <br /> The site has not been mapped for flood potential by the Federal Emergency Management <br /> Agency. Based on upstream data, the areas surrounding the drainage are likely within the 100- <br /> year floodplain of the Big Sandy Creek, but not within the floodway. <br /> 4. Wetlands <br /> The National Wetlands Inventory aerial-based mapping indicates the presence of wetlands <br /> within the permit area. These wetlands are mostly in the existing drainage and will not be <br /> disturbed, aside from wetlands crossings for access. A USACE Wetlands Permit will be <br /> obtained prior to any wetlands disturbances. Exhibit C and F maps show the NWI mapped <br /> wetlands. <br /> 5. Aquifers <br /> The Big Sandy Creek aquifer is the only identified aquifer located at the site. It has an <br /> approximate depth of 10 feet in the upland areas of the site. It is approximately 35 feet below <br /> the surface of the terraces further from the creek. <br /> 6. Surface Water <br /> The mining operation will impact surface water in the area through the stormwater runoff that <br /> enters the site. Map G-1 shows the drainage patterns and how they are affected throughout the <br /> life of the mine. The maps include information on the drainage basins currently, during mining, <br /> Limon Sand& Gravel Pit Lewicki&Associates <br /> August 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.