My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-10-15_PERMIT FILE - M2024053 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024053
>
2024-10-15_PERMIT FILE - M2024053 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 9:19:49 AM
Creation date
10/16/2024 9:10:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024053
IBM Index Class Name
Permit File
Doc Date
10/15/2024
Doc Name
Application
From
Mid-States Materials, LLC
To
DRMS
Email Name
BEH
ZTT
EL1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Mining Timetable <br /> Mining operations at the Limon Sand & Gravel Pit are expected to take approximately 53 years <br /> to complete, based on an annual average production of 300,000 tons. Actual production rates <br /> will fluctuate based on market and deposit conditions. An approximate mining timetable based <br /> on this production and the phased mining plan is shown in Table D-1. <br /> Table D-1 Mining Timetable <br /> Description Time Required <br /> Initial stripping of Upland Area 1 and 1 month <br /> Processing Area <br /> Mining,stripping,and backfilling Area 1 in 3-5 20 years <br /> acre cells.Reclamation work done on areas <br /> that have been mined and backfilled. <br /> Initial stripping of Area 2 1 month <br /> Mining,stripping,and backfilling Area 2 in 3-5 2.5 years <br /> acre cells.Reclamation work done on areas <br /> that have been mined and backfilled. <br /> Initial stripping of Area 3 1 month <br /> Mining,stripping,and backfilling Area 3 in 3-5 20 years <br /> acre cells.Reclamation work done on areas <br /> that have been mined and backfilled. <br /> Initial stripping of Area 4 1 month <br /> Mining,stripping,and backfilling Area 4 in 3-5 5 years <br /> acre cells.Reclamation work done on areas <br /> that have been mined and backfilled. <br /> Initial stripping of Area 5 1 month <br /> Mining,stripping,and backfilling Area 53 in 3- 2.5 years <br /> 5 acre cells.Reclamation work done on areas <br /> that have been mined and backfilled. _ <br /> Initial stripping of Area 6 1 month <br /> Mining,stripping,and backfilling Area 6 in 3-5 2.5 years <br /> acre cells.Reclamation work done on areas <br /> that have been mined and backfilled. <br /> Total 53 years <br /> Limon Sand& Gravel Pit D-3 U Lewicki Sr Associates <br /> August 2024 <br />